FANDOM

  • Inept Wiki User

    Follow-on from July 3rd log (still incomplete at time of writing). Recorded updates made by active contributors within the past four weeks (not fully sorted/verified yet).

    Recent Actions: To be compiled and sorted

    ‎ (K: Uploaded with Licensing, added Summary TSP and categories)

    • 9.00-10.00
    • ‎ (OH&S→‎English: Release date changed from July to August)
    • ‎ (OH&S→‎Volumes 21 to Current: V22 ENG release date changed from July to August)
    • 10.00-12.00 (EDITS TO BE VERIFIED)
    • (I→‎July 2020: 03/07 notes)
    • ‎ (K:)
    • Shared Drafts
      • (O→‎Background Images:)
      • (I:)
      • (I:)
      • ‎ (I→‎Five Suspects:)
    • 12.00-15.00
    • (I→‎Article List: Added sub-header (Given time limit and external circumstances, might have to improvise.))
    • Image-related
      • ‎ (K: Uploaded with Licensing, added Summary TSP and categori…
    Read more >
  • Inept Wiki User
    Series Three Overhaul Project - Loose Notes (31/07/2020)

    These are some loose notes concerning the Series Three Overhaul Project (STOP), as of July 31st 2020.


    In July, aside from the monthly manga releases (which saw the end of Accelerator and Astral Buddy), we saw the release of Souyaku Toaru Majutsu no Index Volume 2 and Chapter 3 of the Agnese SS with the third Railgun T BD release. Railgun T itself also resumed near the end of the month. This has resulted in an influx of information and tasks which are gradually being processed.


    Prompted by recent detrimental edits, comments and misdemeanors, I had planned a major cleanup operation for the remaining period before Railgun T resumes, involving prominent problems in multiple areas across the wiki. Durin…



    Read more >
  • Inept Wiki User

    As you may well know, we've got a lot of stuff which we are working on at the moment, and our progress has been delayed due to both the overwhelming volume and external circumstances.

    One of the tasks on our list is an overhaul of the guidelines and how-to guides, including the ones for Images and References, as well as potential protocol and format updates. It'll probably be a while before the revisions are complete, but given problematic edits observed on the wiki last month, I thought it would be an idea to remind people of key parts of the current general procedures for images and references on the Toaru wiki - a stopgap measure until the guide overhauls are complete.

    The actions which have prompted these reminders, be it through lack of k…

    Read more >
  • Inept Wiki User

    Follow-on from June 20th log (still incomplete at time of writing). Recorded updates made by active contributors within the past two weeks (not fully sorted/verified yet).

    Recent Actions: To be compiled and sorted

    ‎ (Bongo9911→‎Volumes 1 to 10: Spacing tweaks (fixed spacing issue))

    • (BleedingUranium→‎Cultural References: M1911 pistol point tweak/expansion (needs verification))
    • ‎ (K→‎Current Images: Added Anti-Skill images)
    • 10.30-15.00
    • ‎ (IB→‎Mid-June 2020 Search: Crossed off completed task)
    • 15.00-21.30
    • (O→‎Message-only Dedications: NBU to NBC (Universal), →‎10th Year Anniversary Projects: Blood Sign and 10th Anniversary Crossover internal links (tweak?))
    • ‎ (Zaikoi: Uploaded/described)
    • 21.30-: N/A

    20th:

    • Pre-6.30
    • (K: Fixed Jounan Asako image link)
    • ‎ (K→‎Cu…
    Read more >
  • Inept Wiki User

    As noted previously, starting from July 1st, a major cleanup operation is going to be carried out on the Toaru wiki:

    Operation Interim

    Taking place over the remaining period before Railgun T resumes, and prompted by historic and recent detrimental edits, comments and misdemeanors, Operation Interim will involve cleaning of various articles across the wiki, in an attempt to mitigate certain problems in multiple areas across the wiki. It won't be possible to completely neutralize these problems in the given time frame, however it is hoped that the operation will act as a stopgap measure to help the overall overhaul project (with hundreds of plans and operations running in parallel) get back on course.

    During the period in which this operation will …

    Read more >
Community content is available under CC-BY-SA unless otherwise noted.