Toaru Majutsu no Index Wiki
Advertisement

This is a tasklist compiled to aid with organizing and carrying out certain image-related tasks connected to the Series Three Overhaul Project, as of 01/09/2019. If any other major image-related tasks come to mind, please mention them in the comments section below so the tasklist can be adjusted.

Note: Spoilers for anime-only viewers down this list.

General[]

  • Adding relevant information and categories to images lacking them.
  • Renaming some of the images with non-fitting names.
  • Review mass addition of design images without name changes.
  • Review/log superseded/disused infobox/navbox images.
  • Review navbox images needing adjusting.
  • Purge Gunha spam.
  • Check if any Index III images missing from the temporary logs (E1-17, E18-26, Accelerator)
  • Review deletion candidates
  • Log images lacking description and licensing information

Accelerator Anime[]

Currently compiling

Equivalents[]

  • Other: Compiling

Index III (Pre-Episode 18)[]

Currently compiling

Episode Specific[]

Index III (Episode 18 onwards)[]

Currently compiling

Episode Specific[]

Non-Index III/Accelerator Anime[]

  • Blank custom diagram: 10 sphere & 22 path tree (Sephiroth/Qliphoth/Clonoth-type)
  • Enoch: Symbol? Enochian characters? Tablets/Aethyrs?

Novels[]

Currently compiling

Manga[]

Currently compiling

Accelerator Manga:

  • Esther's manga charms/magic circles
  • Esther attempting to revive Hirumi (Accelerator Ch22)
  • Proto-Coffin equipment (Accelerator Ch24)
  • Esther stabbing Hishigata (Accelerator Ch26)
  • Esther saying goodbye to Accelerator (Accelerator Ch36)
  • Train crash (Accelerator Ch51)
  • 'Ingredients' (Accelerator Ch56)

Other[]

Currently compiling

  • Wiki 10th Anniversary: Logo
Series Three Overhaul Project
Recent and Current Notes
STOP Notes
Image Notes
Other
Wiki General Progress Logs
2010s 2018
2019
2020s 2020
2021
2022
2023
2024
Assorted Notes (2020-)
STOP Notes and related 2020
2021
2022
2023
Others
  • Operation Xenolith (04-05/2022): 1
  • 2
  • 3
  • IRI Reorganization (20/05/2022): 1
  • 2
  • 3
  • 4
Key - RDL: Raw Data Log
Initial Notes, Tasklists etc (2018-2020)
Series Tasklists
Primary Contributors
Pre-2021 Image Logs and Tasklists Image Tasklists
Temporary Image Logs
Other October 2019 Tasklist
Plans and Progress Threads
  • Plans and Progress Threads: [[Thread:61481|Index III]]|[[Thread:63651|Accelerator]]|[[Thread:68975|Railgun T]]
Advertisement